Independent Variables (Grids)
Lead | grid: /L (months) ordered (0.5 months) to (9.5 months) by 1.0 N= 10 pts :grid
|
Start Time | grid: /S (months since 01-Jan) periodic (0000 1 Jan) to (0000 1 Dec) by 1.0 N= 12 pts :grid
|
Longitude (longitude) | grid: /X (degree_east) periodic (0) to (1W) by 1.0 N= 360 pts :grid
|
Latitude (latitude) | grid: /Y (degree_north) ordered (90S) to (90N) by 1.0 N= 181 pts :grid
|
References
Kirtman, Ben P., and Coauthors, 2014: The North American Multimodel Ensemble: Phase-1 seasonal-to-interannual prediction; Phase-2 toward developing intraseasonal prediction. Bull. Amer. Meteor. Soc., 95, 585–601. doi: http://dx.doi.org/10.1175/BAMS-D-12-00050.1
Last updated: Wed, 30 Nov 2016 14:53:33 GMT