Lead (forecast_period) | grid: /L (months) ordered (0.5 months) to (8.5 months) by 1.0 N= 9 pts :grid
|
Ensemble Member (realization) | grid: /M (unitless) ordered (1.0) to (10.0) by 1.0 N= 10 pts :grid
|
Forecast Start Time (forecast_reference_time) | grid: /S (months since 1960-01-01) ordered (0000 1 Jan 1981) to (0000 1 May 2012) by 1.0 N= 377 pts :grid
|
Longitude (longitude) | grid: /X (degree_east) periodic (0) to (1W) by 1.0 N= 360 pts :grid
|
Latitude (latitude) | grid: /Y (degree_north) ordered (90S) to (90N) by 1.0 N= 181 pts :grid
|
Height (height) | grid: /Z (m) ordered [ (2.0)] :grid
|