WCRP SMIP-2 forecast_SST RPN T: Forecast Time data

Forecast Time from WCRP SMIP-2 forecast_SST RPN: Canadian Meteorological Centre.

Independent Variables (Grids)

lead time (forecast_period)
grid: /L (months) ordered (0.5 months) to (3.5 months) by 1.0 N= 4 pts :grid
start time (forecast_reference_time)
grid: /S (months since 1960-01-01) ordered (0000 1 Mar 1969) to (0000 1 Dec 2000) by 3.0 N= 128 pts :grid

Other Info

calendar
360
CE
null
CS
null
datatype
realarraytype
gridid
171528248
pointwidth
1
scale_max
null
scale_min
null
standard_name
time
units
months since 1960-01-01
standard units*
0.0833333333333333 ( years since 1960-01-01 00:00.000000000 )

References

Côté, J., S. Gravel, A. Méthot, A. Patoine, M. Roch and A. Staniforth, 1998: The Operational CMC-MRB Global Environmental Multiscale (GEM) Model Part I - Design Considerations and Formulation, Mon Wea. Rev., 126, 1373-1395.

Côté, J., J.-G. Desmarais, S. Gravel, A. Méthot, A. Patoine, M. Roch and A. Staniforth, 1998: The Operational CMC-MRB Global Environmental Multiscale (GEM) Model: Part II - Results, Mon. Wea. Rev. 126, 1397-1418.

Last updated: Fri, 18 Sep 2015 18:39:07 GMT

Data Views

LS
[ S L |]MM


Filters

Here are some filters that are useful for manipulating data. There are actually many more available, but they have to be entered manually. See Ingrid Function Documentation for more information. Average over S L | S L |
RMS (root mean square with mean *not* removed) over S L | S L |
RMSA (root mean square with mean removed) over S L | S L |
Maximum over S L | S L |
Minimum over S L | S L |
Detrend (best-fit-line) over S L | S L |
Convert units from months since 1960-01-01 to

Note on units