Forecast Time from WCRP SMIP-2 forecast_SST RPN: Canadian Meteorological Centre.
Independent Variables (Grids)
- lead time (forecast_period)
- grid: /L (months) ordered (0.5 months) to (3.5 months) by 1.0 N= 4 pts :grid
- start time (forecast_reference_time)
- grid: /S (months since 1960-01-01) ordered (0000 1 Mar 1969) to (0000 1 Dec 2000) by 3.0 N= 128 pts :grid
Other Info
- calendar
- 360
- CE
- null
- CS
- null
- datatype
- realarraytype
- gridid
- 171528248
- pointwidth
- 1
- scale_max
- null
- scale_min
- null
- standard_name
- time
- units
- months since 1960-01-01
- standard units*
- 0.0833333333333333 ( years since 1960-01-01 00:00.000000000 )
References
Côté, J., S. Gravel, A. Méthot, A. Patoine, M. Roch and A. Staniforth, 1998: The Operational CMC-MRB Global Environmental Multiscale (GEM) Model Part I - Design Considerations and Formulation, Mon Wea. Rev., 126, 1373-1395.
Côté, J., J.-G. Desmarais, S. Gravel, A. Méthot, A. Patoine, M. Roch and A. Staniforth, 1998: The Operational CMC-MRB Global Environmental Multiscale (GEM) Model: Part II - Results, Mon. Wea. Rev. 126, 1397-1418.
Last updated: Fri, 18 Sep 2015 18:39:07 GMT